Sorry to start with a whinge but why are residential customers so tight.
If a plumber or sparks turns up with car sized van screwdriver and spanner, then 50-60 an hour plus parts is perfectly acceptable to most people, yet if i turn up with crew cab tipper, trailer, mini digger, wacker, generator, breaker,disc cutter, mixer, hand tools, consumables, a groundworker and a labourer then the silly tossers want to pay peanuts.
Sorry to moan but it just gets right up my nose.
So many dreamers get you to waste time pricing jobs they have no intention of getting done.
I just had 1 customer that thought they could get 100 sq m of tarmac driveway for 1000 including breaking out existing 4" concrete slab driveway redig formation level and install drainage and soakaway.
I havent laughed so much for ages
Sorry to start with a whinge but why are residential customers so tight.
If a plumber or sparks turns up with car sized van screwdriver and spanner, then 50-60 an hour plus parts is perfectly acceptable to most people, yet if i turn up with crew cab tipper, trailer, mini digger, wacker, generator, breaker,disc cutter, mixer, hand tools, consumables, a groundworker and a labourer then the silly tossers want to pay peanuts.
Sorry to moan but it just gets right up my nose.
So many dreamers get you to waste time pricing jobs they have no intention of getting done.
I just had 1 customer that thought they could get 100 sq m of tarmac driveway for 1000 including breaking out existing 4" concrete slab driveway redig formation level and install drainage and soakaway.
I havent laughed so much for ages