I'm trying to spec up an excavator but not sure how to calculate the capacity when centre of gravity of load is offset.
We are connecting a lifting attachment to the quick hitch for concrete pipes up to DN2400.
The combined weight of the hitch/lifter and pipe is 14.5t and the centre of gravity of the whole assembly is 1.4m in front of the quick hitch.
Can anyone suggest a way of getting the right sized machine?
We are connecting a lifting attachment to the quick hitch for concrete pipes up to DN2400.
The combined weight of the hitch/lifter and pipe is 14.5t and the centre of gravity of the whole assembly is 1.4m in front of the quick hitch.
Can anyone suggest a way of getting the right sized machine?
Comment