Well , I got it right , Only because Many years ago I got to load the balls out of the ball mills into the grading Trommel . Used a Massey 50B .Got there while the night shift were still working the end of their shift ,worked with the day shift ,then the afternoon shift ,then back with the nightshift boys .Got home about 2.30 AM ,and had to front for work next morning at 7.30 .. Ahh the good old days .
The ball mill was turning limestone into powder which was mixed with water to make a slurry and Pumped to the cement works though a pipeline .
These days , the pipe line could not handle the volume ,so a rail line was put in and the crushed rock is now taken by rail to the works.
The ball mill was turning limestone into powder which was mixed with water to make a slurry and Pumped to the cement works though a pipeline .
These days , the pipe line could not handle the volume ,so a rail line was put in and the crushed rock is now taken by rail to the works.
Comment