Started on Wednesday and had it all ripped out and carted off with a nine tonne dumper (bar the finishing banks and founds) by close of play a day later. A great client to work for who asks whats required, then lets me get on with it
http://www.incaukltd.co.uk/index.html
Img_1733.jpg
They build steam rooms using selected woods, and saunas .. matter of fact .. I have a notion for a wood burning hot tub myself .. for the butt'n benn ..
I had initially intended to do the job with a 13 tonner .. but we sold our last one when things got really quiet. I was confident the Kubota 8 tonner would manage .. albeit a little slower .. but I have to say she isnt that much slower and impressively .. a 13 tonner would have had me using atleast 20 gallons of diesel a day, but the Kubota is only drinking 10-12
http://www.incaukltd.co.uk/index.html
Img_1733.jpg
They build steam rooms using selected woods, and saunas .. matter of fact .. I have a notion for a wood burning hot tub myself .. for the butt'n benn ..
I had initially intended to do the job with a 13 tonner .. but we sold our last one when things got really quiet. I was confident the Kubota 8 tonner would manage .. albeit a little slower .. but I have to say she isnt that much slower and impressively .. a 13 tonner would have had me using atleast 20 gallons of diesel a day, but the Kubota is only drinking 10-12
Comment