before you can post or view any pictures, DO NOT pm admin asking why you cant view pictures, as you need to be a member for 3 days and have over 3 posts before some content is available: click the sign up link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.
The pad is for storing the greenwaste and then mulching it and stockpiling the Mulch .Komatsu seems quicker than the Hitachi ,but then I don't get on theZaxis 200 a lot .
After the leveling is finished we then load and cart recycled concrete up ,for the grader to spread and roller to compact ..Then possibly load and cart cover fill down to the tip face .